Régeñe Natalia Romero class: Difference between revisions

m
no edit summary
mNo edit summary
mNo edit summary
Line 11:
|Subclasses=
|Built Range=
|In Commission Range=1983–present1983–2022
|Total Ships Building=
|Total Ships Planned=
|Total Ships Completed= 4
|Total Ships Cancelled=
|Total Ships Active= 40
|Total Ships Laid Up=
|Total Ships Lost=
|Total Ships Retired=4
|Total Ships Preserved=
}}{{Infobox ship characteristics
Line 120:
 
The BoP made the controversial decision to hire Tranquíla Steelworks for the frigate contract. Up to this point, the Steelworks had been known for patrol craft and other smaller ships. However, due to the incompetence of the Arma Nautico engineers concerning the ''Princesa Gloria''class, it was felt sourcing other shipbuilding firms was appropriate. The Armada received the ARC ''Régeñe Natalia Romero'' in 1983 and used the vessel as a testbed for several technologies including helicopter-launched torpedos and missiles, hull-mounted sonar, and naval ballistic computers. The other three ships were received and commissioned between 1984 and 1987 and were all well-liked by their crews and shoreside personnel for their simple, strong construction, ease of maintenance, and modularity. ARC ''Régeñe Natalia Romero'' joined her three sister ships as an active Armada ship in 1989. The four vessels were upgraded in 2005 with new radar, electronics, and anti-submarine armaments along with improvements to crew comfort and automation. The frigate hull is expected to be the baseline for future Armada ships of similar size and mission.
 
The four ships were retired in 2022 and stricken from the naval registry, and have been mothballed at Porto Manuel Reserve Dockyards for use in a national mobilization emergency.
[[Category:CyR's pages]]
[[Category:Warships]]
verified
1,240

edits