Nexo: Difference between revisions

3,032 bytes added ,  3 years ago
no edit summary
(tranport)
No edit summary
Line 1:
[[Categorycategory: United Order Republic]] [[Category: Neto Archive]]
 
{{Infobox settlement
| name = Nexo
Line 274 ⟶ 275:
}}
 
The city of Nexo,The Capital city of [[United Order Republic]].The city nicknamed "The Innovated City of Nexo" was due to the fact, the city is a major advance city.NExoNexo is a [[wikipedia:global city|global city]] and [[wikipedia:financial centre|financial centre]] with a modern urban area/city with population of 25 million in 2019. Nexo Considered Advance city to the fact that Nexo is a Greenpower wheel house or High amount of wind turbines.City of Nexo is major in public transportation. From sky to underground, almost fulfill with public transportation.
 
Nexo is crowded with public transportation, due to the fact, People come and go from Western Orderia and Eastern Orderia.Nexo Located On Eastern Orderia.Nexo Founded in 1200 in named for [[Natagaria Fargarus]] who died in [[Orderia Patriotic Revolution]].Founded by [[Netagra Xomar]].The named Nexo is come from shorter name from [[Netagra Xomar]]The word nexo come from "NE"tagra "XO"mar. The named nexo come in early 1201.
 
===History===
The City of Nexo was founded in early 1201,a year after the Independent day. Controlled as Baxxaville major city for decades. During the revolutionary war, the city serve as a fort to offend the OPR Militia to entering the city. In december 14, 1200, The city wall was broken down by OPR Militia, The city also become the first propaganda revolution action in 15 December, 1200. Renamed Nexo by Netgra Zomar in 1201.
 
Nexo in Orderia mean "Future" or "Hope".The Named Nexo was chosen to hoping a grateful new future in new Orderia. A long the year of 1200, the city become home to many people who lost their home during revolutionary war.It officially become Capital City in 1201.
===Transport===
 
A long the year from 1200 until today.The city always improve on its own way. Many improvement in technologies and design of the city. from medieval housing into Modern suburb. Many many future project awaits this city. This city become the star of technologies in Orderia.
=== Transport===
''Main Article: [[List of Orderia Transport]]''
 
Line 289 ⟶ 294:
When comes to Water Transport, Nexo is one of the busiest port. The city was designed to carried many ship as possible. There are ~100.000 ships cargo and passenger all docked in this city. In the Nexo Port.Int Port/harbor,currently can hold ~500.000. Many improvement is made to increase the limit of the harbor. current renovation estimated to hold 620.550 ships.Estimated finish in 2025. Many port was cramped by passenger to in or out the harbor.The harbor also a [[Orderia Naval Defences Focers|Orderia Naval Defence Forces]] (ONDF) as its port,meaning passenger can see some naval fleets in Nexo Port.Int.
 
Nexo Airspace.Int is one of the biggest airport in orderia. Currently the 2nd Largest airport in Orderia. The largest Orderia airport hold by the city of Alpha. Nexo Airport is can hold only 340,000 Aircraft and no more.When reach maximum capacity, most aircraft land in Bartyads.Int Airport,10 km from the city. The airport is cannot be larger than 3,5 km2. The airport can hold 12 million passenger, not the biggest. The Airport is 3 floor high and has a monorail connection to the city.A future improvement was intended but cancelled in 2019 due to land limit. Expanding further can destroyed some of the nearby building. the current renovation improvement is to make longer the runways and to do so is by creating an artificial land.
 
===Project Phase===
For 2 centuries, this city always improve in its own ways.Many demand on improvement to come. This project isn't easy, but if to create a better solution,It takes action.The city become highly demanding on expansion.In 2006, The city just got a new improvement on its international harbor,Nexo.Int Harbor.
 
On 1978 at the end of civil conflict.The city require a major improvement to recover from its losses.
some of is Nexo.Int Airport improvement, Nexo.Int Harbor Imrovement, Tourist attraction, and ground repairation from pits to landmines.
Until today those improvement still going. Around 14 billion Repuls or around 56 billion dollar was spent on those improvement.
Some of improvement was fully opened in May-June 1981-2006.
 
in ground reparation program, only 15% ground recovered and yet there still 75% land area covered by trenches, landmines, crater, and unexploded bomb and shells.
 
{| class="wikitable" style="border: #999 solid 1px; text-align: lcenter; margin-bottom: 0; margin: 1em auto 1em auto"
|-
! colspan="5" style="background: #8B8589;" |'''Phase of City of Nexo Improvement'''
|- style="font-weight:bold; background:#d3d3d3;"
|-
!Phase!!Year!!Description!!Status
|-
|Phase 1||1 January 1979||Ground reparation from trenches,Landmines, and shell and bombs crater||In Progress
|-
|Phase 2||11 May 1981||Nexo.Int Harbor expansion to hold ~500.000 or more||Expanding
|-
| rowspan="2" |Phase 3|| rowspan="2" |15 Apr 2006||Construction of Terminal 3 phase 1 with a capacity of 5 million passengers per annum in Nexo.Int Airport||Completed
|-
|Construction on Railways connection||Expanding
|-
| rowspan="5" |Phase 4|| rowspan="5" |9 Aug 2016||Subways services||Expanding
|-
|Construction on Nexo.Int Airport Railway||Completed
|-
|Expanding on agricultural Industries||Completed
|-
|operating green industrial service||In Progress
|-
|Additional 500m to the second runway in Nexo.Int Airport||In Progress
|-
|Phase 5||2025||Fully operating green city||In progress
|-
|Phase 6||2029||Underwater city expansion||Delayed
|}
 
===Public services===
 
===Health Care===
 
===Sport ===
 
===Holidays and Events===
verified
204

edits