Cryrian Defense Forces: Difference between revisions

Line 727:
The project almost immediately became mired in political conflicts and legal disputes alongside the rest of the program. The Verventis Plant was to be built atop what had once been a holy site for the Highlands elves, and elven groups were able to leverage new Historic Commission regulations to bring about a Court order halting construction. However, the Historic Commission later changes its own regulations in response, allowing the construction to continue. This resulted in elven groups occupying the site. The National Police in turn moved to eject them in a midnight raid, a decision which led to the infamous Verventis Riots. One person is reported to have died directly in the riots, but some 300 were injured and over 800 arrests were reported. Local hospitals in the rural area were overwhelmed by a massive surge in hypothermia cases as the NP used watercannons in the freezing weather, and it is believed that several more deaths occurred in the immediate aftermath of the clash.
 
It is understood that a simultaneous power struggle took place within the Cryrian government between the Securitate and the General Staff. While the occurrence of any such conflict has been denied by successive governments in Leidenstad, among the end results was the cancellation of the military nuclear program. The civilian program would continue and the Verventis Power Plant would ultimately be completed, but the Cryrian government disavowed the development of nuclear weapons. The Kingdom instead moved towards a doctrine of nuclear latency for the remainder of the 20th-century. Efforts to develop ballistic missile delivery systems were also halted at this point, and the accumulated technology and expertise was instead spun off into what would become the [[Royal Cryrian Space Agency]].
 
==== Latency Period ====
While never publicly codified, Leidenstad effectively changed tacks to pursue a nuclear latency policy after 1975. This was felt to be both more politically palatable given the difficult internal situation in the aftermath of the Verventis Riots, and also better suited to Cryrian defense posture and its wider international position. Under such a doctrine, Cryria was to continue developing its civilian program and through it would remain "A screwturn" away from obtaining nuclear weapons in the event that its national security position came under a severe threat. While rarely discussed openly, it has since become apparent that the Kingdom planned for a six-month breakout period to a nuclear device in the event of a "serious crisis," which encompassed circumstances that might include foreign nuclear threats or dangers to the existence of the Cryrian state itself. The latencyLatency doctrineDoctrine fell under the mandate of the Special Materials Division, which also continued to provide protection and oversight for nuclear materials and facilities in the Kingdom.
 
The transition to the latencyLatency doctrineDoctrine and the subsequent transfer of resources away from military purposes allowed the civilian program to flourish. ThroughoutAs itsof entire history2002, Cryriathe hasKingdom builtoperated eightnineteen nuclearcommercial reactors as well as seven smaller ones for research and radiopharmaceutical purposes. Since Verventis, all Cryrian power plants, ofhave used the Cryrian Deuterium Uranium(CDU) pressurized heavy-water reactor design, which fivecan remainutilize operationalunenriched today.natural Auranium sixthor planturanium ismixed expectedwith toother bematerials commissionedsuch byas plutonium or thorium. In the enddecades after the launch of 2022.Verventis, TheCryria Kingdomhas alsopositioned builtitself elevenas researcha leader in heavy water reactors, ofthat whichcan twooperate remainon activenatural todayuranium, atand the UniversitiesCDU ofmodel Leidenstadhas andbeen exported abroad to nations such as TalvereÄlemsi respectivelyNegdel.
 
Since the establishment of the Latency Doctrine, the Kingdom also created a stockpile of nuclear materials from and ostensibly for the civilian program. By 2002 it had accumulated over twenty tons of plutonium and half a ton of uranium. The independent launch capabilities of the RCSA also meant that the country had developed much of the technology needed for an effective delivery system.
 
==== Second Nuclear Program(2002-2003) ====
 
==Major Installations==
verified
1,611

edits