Cryrian Defense Forces: Difference between revisions

Line 715:
 
KAMI planned to use heavy water reactors fueled by its low-grade uranium to produce plutonium, and to that end was able to take advantage of Cryria's position as an early producer of heavy water. The Langtrup and Arensla hydroelectric power plants reportedly furnished KAMI with several tons of heavy water in 1958. The first Cryrian reactor was known as A1 and was built in an underground cavern in the Highlands at the end of 1961. A1 was relatively small, and with a thermal power of 1 MW it existed primarily for further research purposes. That same year, uranium extraction in the Highlands finally reached its intended capacity. In 1965, the Special Materials Division reported to the General Staff that Cryria would be able to rapidly assemble a nuclear device once plutonium production began. A second, larger research reactor named A2 began operations in 1966.
 
In 1967, the project accelerated when construction began on B1, also known as the Ulholm Nuclear Power Plant. This was a dual-use facility and the first Cryrian nuclear facility that would have a commercial use. Located underground in Ulholm County, south of Leidenstad, the plant provided limited amounts of power to the capital city. Ulholm was completed in 1972 and like much of the Cryrian nuclear energy program at this time is believed to have had a covert military purpose, namely the production of plutonium.
 
==Major Installations==
verified
1,611

edits